Pailin Vocational High School Construction as to January 2022 | 柬埔寨珠山中學 興建情況 (2022年1月份)

Real Elevation
G/F Front Atrium G/F Class Room 1 & 2 / Assembly Hall
G/F Teacher Room Pantry inside G/F Teacher Room
G/F Male Lavatory G/F Corridor outside Teacher Lavatories
1/F Atrium 1/F Atrium
1/F Class Room 3 1/F Class Room 4
1/F Computer Room and Library 1/F Staircase Railing
2/F Atrium 2/F Laboratory
2/F Cooking Classroom 2/F Sewing Classroom
Lightning Pole at Roof Roof
Parking Area : Absorption Area Absorption Area
Retaining Wall adjacent to Road completed Rainwater Manhole
G/F Atrium Opening for Access Road to Phase 2
Setting out boundary point by Government Setting out at the back of site near country road